RBP Benefits
The benefits of Rotary Bored Piling (RBP) compared to Continuous Flight Auger (CFA) piling lie in the enhanced pile capacities that can be achieved. Utilizing casing allows for the creation of open holes with larger diameters at considerable depths. This capability facilitates the augering or coring process for creating sockets in deep and stable strata, the installation of long, multi-sectioned, and/or intricate reinforcement cages, as well as the incorporation of complex pile instrumentation and load cells to assess maximum load capacity or validate design assumptions.
It is common to find RBPs extending beyond 60 meters in depth, and recent trends indicate the construction of piles exceeding 70 meters in depth.
FORETEK SERVICE CAPABILITY
As Foretek for the Last 40 years completed millions of meters of RBP we have the exact solution you need on time and budget